Titel:
Cost Benefit Analysis for safety projects at sea � Does the method give the entire picture? Experience from analysis of the Stad sea tunnel.
Abstract:
The work has revealed that the precautions and adaptations the seafarers make to avoid dangerous situations at sea, are not sufficiently reflected in the CBA method used.
Forfatter:
Trude T�rset, SINTEF
Solveig Meland, SINTEF
Danske Keywords:
Nyttekostnadsanalyse, Stad skipstunnel
Engelske Keywords:
CBA, Stad sea tunnel
År:
2008
Link: Hent paperet som PDF-fil |