Titel:
Cost Benefit Analysis for safety projects at sea � Does the method give the entire picture? Experience from analysis of the Stad sea tunnel.

Abstract:
The work has revealed that the precautions and adaptations the seafarers make to avoid dangerous situations at sea, are not sufficiently reflected in the CBA method used.

Forfatter:
Trude T�rset, SINTEF Solveig Meland, SINTEF

Danske Keywords:
Nyttekostnadsanalyse, Stad skipstunnel

Engelske Keywords:
CBA, Stad sea tunnel

År:
2008

Link: Hent paperet som PDF-fil